Grúa portuaria cargando un contenedor sobre una estructura industrial.

Safe cable guidance on STS cranes at high wind speeds

e-chain® replaces the festooning system for crane booms and saves the operator time and money

Profile

  • What was needed: plastic-energy chain
  • Requirements: A safe cable routing system was required that could move all cables safely even at wind speeds of over 70 km/h at the harbour.
  • Industry: Crane technology
  • Success for the customer: Thecables in the old festooning system intertwined and had to be untangled at great expense in terms of time and money to prevent them from being damaged afterwards. With the e-chain®, such work is now completely eliminated. Even after the first few months, the system proved to be the right choice.
Varios brazos de grúa con componentes de igus en una instalación industrial.

Robust and smart – how digitally networked energy chains enhance STS cranes in the Port of Rotterdam

Folleto con un caso de estudio sobre grúas digitalizadas y logística portuaria sobre fondo naranja.

Problem

Solution

Tramo de cadena portacables en una estructura industrial alta sobre una zona con vehículos.
Terminal de contenedores con contenedores apilados y un brazo de grúa en primer plano.

Consultas

Estaré encantado de responder a sus preguntas personalmente

Profile
Borisenko Martin

Distribuidor

Escribir un correo electrónico

Consultas y envíos